Magenta Power, HPCL set up EV charging station at HPCL Staff Colony

Date: 24 Dec 2018

Magenta Power, a pioneer in renewable energy solutions and EV charging infrastructure space in India, has added another feather in its cap by installing an EV charging station “ChargeGrid” at the HPCL staff colony (HP Nagar East Housing Complex) in Chembur, Mumbai.

HP Nagar East Housing Complex in Chembur, Mumbai is a Platinum rated residential complex and is the first PSU Colony across the nation to be certified as a green colony by Indian Green Building Council (IGBC). The colony has undertaken various sustainability development initiatives like Rooftop Solar Power Plant, Solar Water Heaters, Rain Water Harvesting, Organic Waste Converter, Energy Efficient Lighting etc. As a further commitment towards the Go Green and zero emission initiative, the colony has installed EV charging station within its premises in collaboration with Magenta Power.

The charging station shall be connected and operated via Magenta’s ‘ChargeGrid App’ which shall allow cashless transactions and remote monitoring for the EV users. ChargeGrid App provides an integrated platform for viewing network of charging stations.

The charger installed by Magenta Power shall have the ability to charge up to 3 electric vehicles at a time. It comes with an easy to use built-in touch screen feature so the users can conveniently charge without much hassle. The idea is to make charging experience as seamless as possible.

 

FOLLOW US ON



comments (0)
leave a comment
 





Contact Us

For Marketing & Sales, Contact:
Jisha P.
jisha.motown@gmail.com
sales@motownindia.com
advertising.motown@gmail.com
Ph: 9958125645

Delhi office:
Motown India
145 B/9, First Floor, Kishangarh,
Next to United Church of India
Vasant Kunj, New Delhi 110070 

© 2019 MotownIndia - ALL RIGHTS RESERVED
POWERED BY - VIDYA SOFTWARES